首页> 外文OA文献 >Project procurement method : the conflicts in construction projects procured under design and build method
【2h】

Project procurement method : the conflicts in construction projects procured under design and build method

机译:工程采购方法:设计建造法采购建设项目中的冲突。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Design and build procurement method is one of the procurement methods where the contractor is responsible to carry out both the design and construction work of the project. Design and build contract give convenience to the client by combining project cost, schedule, design and quality into one single point of responsibility. Even though, design and build contract give many benefits to contractor and client but there are contractors and clients who still feel less excited with the benefits offered. The number of projects procured under design and build method are also decreasing in recent years. Therefore, this research purpose is to identify the conflicts in design and build construction project and propose the solution to overcome the conflicts in design and build contract. A research questionnaire was designed and distributed to 92 grade 7 contractors in Pahang state. The data obtained from respondents were analyzed using mean value analysis. The result of the survey indicated that five mostly occurred conflicts in design and build projects are variation order, delay in work activities, client delay (lack of payment), client lack interaction with contractor and time overrun or project delay. By referring to the literature review, contract form (Standard Form of Design and Build Contract – PWD Form DB (Rev.1/2010), Standard Form of Contract Be Used Where Drawings and Specifications Form Part of the Contract – PWD Form 203 (Rev. 1/2010) and Agreement and Conditions of PAM Contract 2006 with Quantities and interview with two experts from Perbadanan Kemajuan Negeri Pahang (PKNP) which are an engineer and an quantity surveyor, five solution flowcharts was proposed to overcome the five mostly occur conflicts in design and build projects. The result of this research will help the construction team, design team and client of design and build projects to systematically and effectively manage their conflicts and indirectly will help them in maintaining their good relationship. In the future study, it is proposed for the future researcher to increase the number of respondent by expanding the scope of study. When the scope of study is bigger, the researcher can know the various types of conflicts and propose a more accurate solution to overcome the conflicts
机译:设计和建造采购方法是承包商负责项目设计和施工工作的一种采购方法。设计和建造合同通过将项目成本,进度,设计和质量结合到一个单一的责任点,为客户提供了便利。即使设计和建造合同给承包商和客户带来许多好处,但是仍有承包商和客户对所提供的好处感到不那么兴奋。近年来,以设计和建造方式采购的项目数量也在减少。因此,本研究的目的是识别设计与施工合同中的冲突,并提出解决方案,以克服设计与施工合同中的冲突。设计了一份调查问卷,并分发给了彭亨州的92个7年级承包商。使用均值分析对从受访者那里获得的数据进行分析。调查结果表明,在设计和建造项目中最经常发生的五个冲突是变更顺序,工作活动延迟,客户延迟(付款不足),客户与承包商之间缺乏互动以及时间超支或项目延迟。通过参考文献回顾,合同表格(设计和建造合同的标准表格– PWD表格DB(Rev.1 / 2010),合同的标准形式用于图纸和规格构成合同的一部分– PWD表格203(Rev. (1/2010)以及《 2006年PAM合同与数量的协议和条件》,并采访了来自工程师和数量测量师Perbadanan Kemajuan Negeri Pahang(PKNP)的两位专家,提出了五个解决方案流程图,以克服五个最常见的冲突设计和建造项目:这项研究的结果将有助于施工团队,设计团队以及设计和建造项目的客户系统地,有效地管理它们之间的冲突,并间接地帮助他们保持良好的关系。建议未来的研究者通过扩大研究范围来增加被访者的数量,当研究范围更大时,研究者可以知道各种类型冲突并提出更准确的解决方案以克服冲突

著录项

  • 作者

    Mai Ling Teon;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号