首页> 外文期刊>Construction management & economics >Causes of delays in Saudi Arabian public sector construction projects
【24h】

Causes of delays in Saudi Arabian public sector construction projects

机译:沙特阿拉伯公共部门建设项目延迟的原因

获取原文
获取原文并翻译 | 示例
           

摘要

Many public construction projects have been undertaken throughout the Kingdom of Saudi Arabia as part of the government's national development plans in the past three decades, with significant public expenditure involved. One of the critical problems concerning these projects is the frequent and lengthy delays that occur. In order to improve the situation, it is first necessary to identify the major causes involved. Several studies have already been reported which do this but all use different sets of variables. Also, none has attempted to identify the extent to which improvements are possible in practice. A new survey is reported that uses all the variables from the previous work and measures for both current degree of effect on delays and the extent to which each can be practically improved. These are contained in seven groupings: client, contractor, consultant, materials, labour, contract and relationship-related causes. The survey covers a sample of 86 clients, contractors and consultants working in the Saudi construction industry. The analysis reveals some considerable heterogeneity between the cause groupings and respondent groupings in terms of means and correlations, apparently partly due to lack of knowledge of respondents and a tendency for the consultants to blame the contractors for the delays and vice versa. The main results, therefore, are disaggregated to reflect the views of each respondent group concerning each group of causes. In general however, it is found that the most influencing current cause of delay is the lack of qualified and experienced personnel-attributed to the considerable amount of large, innovative, construction projects and associated current undersupply of manpower in the industry.
机译:在过去的三十年中,作为政府国家发展计划的一部分,沙特阿拉伯王国已进行了许多公共建设项目,其中涉及大量公共支出。与这些项目有关的关键问题之一是频繁而漫长的延迟。为了改善这种情况,首先必须确定所涉及的主要原因。已经报道了一些研究,但都使用不同的变量集。而且,没有人试图确定实践中可能进行改进的程度。据报道,一项新的调查使用了先前工作中的所有变量和措施,以衡量当前对延误的影响程度以及可以实际改善的程度。它们分为七个组:客户,承包商,顾问,材料,人工,合同和与关系有关的原因。该调查涵盖了在沙特建筑业工作的86位客户,承包商和顾问的样本。分析表明,在均值和相关性方面,原因分组与响应者分组之间存在相当大的异质性,这显然部分是由于缺乏对受访者的了解以及顾问倾向于将承包商的拖延归咎于承包商,反之亦然。因此,对主要结果进行了分类,以反映每个受访者群体对每组原因的看法。然而,总的来说,发现造成当前延误的最主要原因是缺乏合格和经验丰富的人员,这归因于行业中大量的大型创新工程项目以及相关的当前人力不足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号