Caterpillar soil compactor using the new machine-integrated soil compaction measurement technology Machine Drive Power (MDP) is said to have drastically reduced the number of passes needed on a dam jobsite near Triantafullia in northern Greece. Tena, one of the largest construction companies in northern Greece, was responsible for placing 42m of compacted materials on an existing embankment of 33m. The earthmoving volume for the massive earthen dam exceeded 350,000m3. The material had to be applied in 200mm layers, and compacted to 150mm-at a length of 364m and a width of 18m. Volume was only part of the challenge. George Nathanailidis, president and chief executive officer of Tena, said that because the work was in sandy clay, achieving uniform compaction would have proved difficult, while monitoring densities would be challenging and less than comprehensive.
机译:卡特彼勒土壤压实机采用了新型的机器集成的土壤压实度测量技术Machine Drive Power(MDP),据称已大大减少了希腊北部Triantafullia附近大坝工地上所需的通过次数。 Tena是希腊北部最大的建筑公司之一,负责将4,200万压实材料放置在现有的3,300万路堤上。大型土坝的运土量超过350,000立方米。该材料必须以200mm的层厚度施加,然后压实至150mm,长度为364m,宽度为18m。销量只是挑战的一部分。 Tena总裁兼首席执行官George Nathanailidis表示,由于这项工作是在沙质粘土中进行的,因此很难实现均匀压实,而监控密度将具有挑战性,而且不够全面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号