首页> 外文期刊>Construction Europe >Bridging the Genoa gap
【24h】

Bridging the Genoa gap

机译:弥合热那亚差距

获取原文
获取原文并翻译 | 示例
           

摘要

In August, 2018, disaster struck the city of Genoa, when a 200m section of the renowned Morandi bridge collapsed, including one of its three supporting towers. The incident killed 43 people and left a further 600 homeless. With the city in great distress, local authorities took decisive action; they commissioned designs for a new bridge and instigated a plan for the demolition and clearance of the Morandi bridge. At the same time, calls were made to the country's leading construction firms to prepare for the construction of the new structure. The Genova San Giorgio bridge would be built as a mixed steel-concrete structure, 1,067 metres in length, with 19 spans supported by 18 elliptical reinforced concrete stacks.
机译:2018年8月,灾难袭击了热那亚市,当时莫兰迪桥的200米段崩溃了,包括其三座支撑塔之一。事件杀死了43人,再留下了600名无家可归者。随着城市的痛苦,地方当局采取了决定性的行动;他们委托新桥梁设计并煽动摩兰迪桥拆迁和清关计划。与此同时,拨打了该国领先的建筑公司,为建设新结构做准备。 Genova San Giorgio Bridge将作为混合钢混凝土结构,长度为1,067米,具有19个椭圆钢筋混凝土堆叠的19个跨度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号