首页> 外文期刊>Construction Europe >The road to recovery
【24h】

The road to recovery

机译:恢复的道路

获取原文
获取原文并翻译 | 示例
           

摘要

Major road construction contracts are never easy to come by and are always hard won. The award of a lucrative roads contract generally comes as the result of many years of experience and a combination of skill sets in the design team and workforce that enable the contractor to be precise about the challenges, timescale, equipment and, of course, costs involved. In terms of challenges, today's projects are more complex than ever before, given the new normal of social distancing and additional pressures of ensuring the work is undertaken sustainably.
机译:主要的道路施工合同永远不会容易地进入,总是很难过。 Lucrived Roads合同的奖励通常是由于多年的经验以及设计团队和劳动力的技能组合,使承包商能够精确了解挑战,时间尺度,设备,当然是所涉及的费用。在挑战方面,鉴于社会疏散的新正常和确保工作的额外压力是可持续的,今天的项目比以往任何时候都更加复杂。

著录项

  • 来源
    《Construction Europe》 |2020年第8期|17-1820-22|共5页
  • 作者

    Mike Hayes;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号