Premature distresses at transverse construction joints (TCJs) in continuously reinforced concrete pavements

机译:连续钢筋混凝土路面中横向施工缝(TCJ)的过早遇险

获取原文
获取原文并翻译 | 示例
       

摘要

The long-term performance of continuously reinforced concrete pavement (CRCP) has been quite satisfactory in Texas, providing an important network of highways with heavy truck traffic and minimal maintenance. However, certain forms of distresses were observed within a few years after construction, requiring repair of the distresses and causing traffic delays. Distresses at transverse construction joints (TCJs) were one of the most frequently observed distresses, and efforts were made to identify the mechanisms of those distresses and develop or improve design standards or specifications. Field evaluations of concrete and steel behavior near TCJs were made using various gages. The analysis of the data indicates that the current practice of placing additional tie bars at TCJs, along with poor construction practices, are the major causes of the distress. There is a large difference in the behavior of reinforcement between additional tie bars and longitudinal steel that is continuous through transverse construction joints. The premise that additional tie bars at TCJs will behave the same way as longitudinal steel, thus reducing steel stresses of longitudinal steel at TCJs, keeping the joint widths tight, and improving TCJ performance, is not necessarily correct. Also, the use of additional tie bars makes the consolidation of concrete at TCJs difficult due to the reduced spacing between longitudinal reinforcing steel. Not placing additional tie bars at TCJs, and the use of relief transverse saw cut joints near TCJs, along with improved construction practices at TCJs, will minimize the distresses.
机译:得克萨斯州的连续钢筋混凝土路面(CRCP)的长期性能非常令人满意,它提供了重要的高速公路网络,卡车运输量大且维护量少。但是,在建造后的几年内观察到某些形式的遇险,需要对遇险进行维修并造成交通延误。横向施工缝(TCJ)处的遇险是最常见的遇险之一,并已努力确定这些遇险的机理,并制定或改进了设计标准或规范。使用各种量规对TCJ附近的混凝土和钢的性能进行了现场评估。数据分析表明,目前在TCJ处放置附加拉杆的做法以及不良的施工做法是造成困扰的主要原因。附加拉杆和通过横向施工缝连续的纵向钢之间的钢筋性能存在很大差异。前提是,在TCJ处附加的拉杆的行为与纵向钢相同,从而减少TCJ处的纵向钢的应力,保持接头宽度紧凑并改善TCJ性能并不一定是正确的。另外,由于纵向钢筋之间的间距减小,因此使用附加的拉杆会使TCJ处的混凝土加固变得困难。不在TCJ处放置额外的拉杆,并在TCJ处使用浮雕横向锯切缝,以及在TCJ处改进施工方法,可以最大程度地减少麻烦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号