首页> 外文期刊>Concrete >Materials gantry for the Swale Crossing
【24h】

Materials gantry for the Swale Crossing

机译:Swale Crossing的材料龙门

获取原文
获取原文并翻译 | 示例
           

摘要

The Isle of Sheppey is currently serviced by one crossing over the River Swale. The vertical lift Kingsferry Bridge provides access for road and rail traffic, as well as for pedestrians. Marine vessels travelling along the Swale take priority over users of the bridge and the lift imposes long delays and tailbacks during the rush hour. The lift mechanism has occasionally compounded these delays by sticking temporarily in the raised position, thereby causing the sole route of access to the Island to be cut off, resulting in concern for the local community.
机译:目前,谢珀岛(Isle of Sheppey)有一条穿越Swale河的渡轮。垂直升降机Kingsferry桥为道路和铁路交通以及行人提供通行通道。沿着Swale航行的船舶优先于桥梁使用者,在高峰时段,缆车会造成长时间的延误和拖尾。举升机构有时会暂时卡在升高的位置,从而加剧了这些延误,从而导致通往岛的唯一通道被切断,引起了当地社区的关注。

著录项

  • 来源
    《Concrete》 |2006年第2期|p.24-25|共2页
  • 作者

    Tim Burgess;

  • 作者单位

    Tony Gee and Partners;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号