首页> 外文期刊>Concrete >High volume concrete plant takes on Olympic challenge
【24h】

High volume concrete plant takes on Olympic challenge

机译:高产量混凝土厂迎接奥运挑战

获取原文
获取原文并翻译 | 示例
           

摘要

The installation of a large ready-mixed concrete batching plant at the London Olympic Park site in Stratford proved quite a challenge for London Concrete. Prentis Polhill of Steelfields reports. For a start, timing was tight, even for a company used to fast-track installation. London Concrete had only a short period to get the entire site up and running, including getting the plant erected and commissioned and into operation by May 2008. The plant also had to meet the high volume requirements of the Olympic Park contractors and the material it produced had to meet the challenging targets set by the Olympic Delivery Authority (ODA) for the use of recycled materials. On-site facility The ODA's requirement for a site plant had been carefully thought through; it provided an on-site dedicated supply and confined all concrete mixer lorry movements to the Olympic Park and away from the surrounding roads.
机译:在斯特拉特福德的伦敦奥林匹克公园工地上安装大型预拌混凝土配料厂对伦敦混凝土公司来说是一个很大的挑战。 Steelfields的Prentis Polhill报告。首先,即使对于曾经快速安装的公司来说,时间也很紧。伦敦混凝土公司只有很短的时间才能使整个场馆正常运转,包括在2008年5月之前建立并调试工厂并投入运营。该工厂还必须满足奥林匹克公园承包商及其所生产材料的大量需求必须达到奥林匹克交付管理局(ODA)为使用再生材料设定的具有挑战性的目标。现场设施ODA对现场工厂的要求已经过深思熟虑。它提供了现场专用供应,并将所有混凝土搅拌车的运输活动限制在奥林匹克公园内并远离周围道路。

著录项

  • 来源
    《Concrete》 |2011年第7期|p.54-55|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号