首页> 外文期刊>Betonwerk + Fertigteil-Technik >2.2 km of DN 3000 reinforced-concrete jacking pipes for new sewers
【24h】

2.2 km of DN 3000 reinforced-concrete jacking pipes for new sewers

机译:2.2公里的DN 3000钢筋混凝土顶层顶管,用于新下水道

获取原文
获取原文并翻译 | 示例
       

摘要

Increasing sealing of surfaces in particular in large cities and the more frequent occurrence of heavy-rain events result in considerable quantities of sewage that overload the sewer systems. The decision was made for the construction project "Sewer rehabilitation Landsberger Strasse" to achieve a significant improvement of the hydraulic situation in the sewer network in the west of Munich. The objective was to relieve the existing and often overloaded sewer system in the area of Pasing and Laim and to divert better and more effectively the critical flows of combined wastewater in the east and/ or west of Munich by a new sewer 3 m in diameter. The first partial construction section in the area of "Offenbachstrasse" up to "Am Knie," as well as part of "Laimer Kreisel," was already successfully completed in 2016. Next followed the second construction section "Landsberger Strasse." The successful completion had closed the gap between the two preceding construction measures. The contract for the extensive works had been awarded by the Munich drainage service Muenchner Stadtentwaesserung, which had also been in charge of planning and implementing the construction project. Muenchner Stadtentwaesserung is also responsible for regular maintenance and surveillance of the public sewer system, so that its experience and knowhow could be considered in planning the project.
机译:在大城市增加表面的密封特别是和豪雨事件出现得更频繁导致相当数量的污水是超载的下水道系统。这一决定是为建设项目“下水道康复兰茨贝格尔大街”,以实现在慕尼黑西部的污水管网的水力情况显著改善做出。其目的是通过在直径新下水道3米以减轻现有的和经常过载下水道系统在帕兴和莱姆的面积和转移更好和更有效地在慕尼黑的东部和/或西组合废水的临界流动。在“Offenbachstrasse”的区域上的第一部分工段达“AM Knie,”还有一部分“KREISEL雷梅霍夫,”已经成功地在2016年完成接下来跟着第二工段“兰茨贝格尔大街。”成功完成关闭了前两个施工措施之间的差距。为广泛的工作合同已经由慕尼黑排水服务Muenchner Stadtentwaesserung,这也一直负责规划和实施建设项目的奖励。 Muenchner Stadtentwaesserung还负责定期维护和公共下水道系统的监控,以便其经验和专有技术能够在规划项目予以考虑。

著录项

  • 来源
    《Betonwerk + Fertigteil-Technik》 |2021年第5期|18-23|共6页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 02:10:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号