Central Alabama's Valley Creek: Wastewater Treatment Plant Rebuilt

机译:阿拉巴马中部的Valley Creek:废水处理厂改建

获取原文
获取原文并翻译 | 示例

摘要

When Central Alabama received an unexpected deluge in the Spring of 2005-10 inches of rain fell within a 24-hour period-it caused massive flooding and significantly raised the ground water table around the Valley Creek Wastewater Treatment Plant in Bessemer, which had been com Dieted three weeks earlier. This rapid rise in the amount of ground water caused the 5-foot-thick floor of the plant to shift upward 2 Vi inches. Under this tremendous hydrostatic pressure, the walls, beams and piping structure of the massive building suffered extensive damage. The influent pump station had floated upward 2 1/2 inches cracking concrete columns and beams, along with pipe supports. The hydrostatic pressure that was exerted on the walls and floors caused 1-inch-thick steel pipes and 1 1/2-inch diameter flange bolts to pop and stretch. The pump station cracked like the spine of a book, down the length of the wall between the wet well and the dry well. The fact that the wet well and the upper wet well were full of water kept the upward movement limited to 2 1/2 inches and prevented further damage.
机译:2005年春季,阿拉巴马州中部地区遭受暴雨袭击时,在24小时内出现了几英寸的降雨,这导致了大面积的洪水泛滥,并大大提高了贝塞默(Bessemer)山谷河溪污水处理厂附近的地下水位。三周前节食。地下水量的迅速增加导致工厂5英尺厚的地板向上移动了2 Vi英寸。在巨大的静水压力下,大型建筑物的墙壁,横梁和管道结构遭受了广泛的破坏。进水泵站已经向上漂浮了2 1/2英寸的破裂混凝土柱和梁以及管道支架。施加在墙壁和地板上的静水压力导致1英寸厚的钢管和1 1/2英寸直径的法兰螺栓突然弹开。泵站像一本书的书脊一样破裂,沿着湿井和干井之间的壁长下降。湿井和上部湿井充满水这一事实将向上运动限制在2 1/2英寸,并防止了进一步的损坏。

著录项

  • 来源
    《Concrete Openings》 |2008年第1期|p.6-12|共7页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑材料;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号