...
首页> 外文期刊>Concrete Openings >Mile-High Cutting
【24h】

Mile-High Cutting

机译:英里高切割

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

To facilitate a massive $500 million expansion project at Denver International Airport (DIA), a concrete cutting specialist has been working on multiple contracts to assist with retrofits, adjustments and cutting services at the main terminal building. One of the latest tasks assigned to the contractor was the cutting and removal of an 8-inch-thick patio deck that was built against a glass wall facing the airport's security screening area. Therefore, all eyes would be on the operators as they cut sections weighing up to 60,000 pounds each.
机译:为促进丹佛国际机场(DIA)一项耗资5亿美元的大规模扩建项目,混凝土切割专家一直致力于多个合同,以协助主航站楼进行翻新,调整和切割服务。分配给承包商的最新任务之一是切割和拆除一个8英寸厚的露台甲板,该露台是靠着面向机场安全检查区域的玻璃墙建造的。因此,当操作员切割每个重达60,000磅的切片时,所有的目光都将注视着操作员。

著录项

  • 来源
    《Concrete Openings》 |2013年第2期|6-10|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号