首页> 外文期刊>Concrete international >A Seawall Constructed with GFRP Bars as Structural Reinforcing
【24h】

A Seawall Constructed with GFRP Bars as Structural Reinforcing

机译:用GFRP筋建造的海堤作为结构加固

获取原文
获取原文并翻译 | 示例
       

摘要

In 2016, the seaside community of Flagler Beach, FL, was one of the many communities severely impacted and battered by Hurricane Matthew. To help mitigate the effects of future storms, a secant-pile seawall is being constructed east of State Road AlA (SR A1 A) at Flagler/Beverly Beach in the northeastern section of Flagler County, FL. When completed, the new barrier will extend 1.5 km (almost 5000 ft). To ensure that the protective system remains resilient for decades, the project is being built using concrete reinforced with glass-fiber-reinforced polymer (GFRP) bars. The secant piles have been completed, and the seawall pile cap with vegetative cover is expected to be substantially completed by October 2019.%En 2016, la comunidad costera de Flagler Beach, FL, fue severamente impactada por el huracán Matthew. Para ayudar a mitigar los efectos de futuras tormentas, se está construyendo un dique de contención de pilotes secantes de concreto al este de la carretera estatal AlA. El dique de contención se compone de barras de refuerzo de polímero reforzado con fibra de vidrio (GFRP por sus siglas en inglés) en sus 1847 pilotes secantes y cabezal continuo. Se espera que las barras GFRP no corrosivas proporcionen costos mínimos de mantenimiento y reparación a lo largo del ciclo de vida del dique de contención.
机译:2016年,佛罗里达州弗拉格勒海滩的海滨社区是遭受飓风“马修”袭击和殴打的众多社区之一。为了帮助减轻未来风暴的影响,正在佛罗里达州弗拉格勒县东北部的弗拉格勒/贝弗利海滩的AlA国道(SR A1 A)以东建造割线桩海堤。完成后,新障碍将延伸1.5公里(近5000英尺)。为了确保保护系统在数十年内保持弹性,该项目使用玻璃纤维增​​强聚合物(GFRP)钢筋加固的混凝土建造。割线桩已经完成,带有植物覆盖物的海堤桩帽预计将在2019年10月之前基本完成。%En 2016,佛罗里达州弗拉格勒海滩社区,fue severamente Impactada por elhuracánMatthew。卡拉多里埃斯特拉国家安全局的飞行员,民政事务总局副局长在1847年从飞机上连续飞行的飞行员和飞行员(包括玻璃钢和玻璃纤维)。沙漠之角GFRP no corrosivas proporcionen costosmínimosde mantenimiento yreparacióna lo largo del ciclo de vida del dique decontención。

著录项

  • 来源
    《Concrete international》 |2019年第9期|26-3060|共6页
  • 作者单位

    Department of Civil, Architectural, and Environmental Engineering, University of Miami, Coral Gables, FL;

    FDOT - State Structures Design, In Tallahassee, FL;

    Mott MacDonald Florida LLC;

    Malcolm Drilling Company, Inc.;

    Department of Civil, Architectural, and Environmental Engineering at the University of Miami;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:29:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号