首页> 外文期刊>Computers & operations research >The type E simple assembly line balancing problem: A mixed integer linear programming formulation
【24h】

The type E simple assembly line balancing problem: A mixed integer linear programming formulation

机译:E型简单装配线平衡问题:混合整数线性规划公式

获取原文
获取原文并翻译 | 示例
       

摘要

Although the simple assembly line balancing problem (SALBP) is the topic of many studies, typically they either consider minimizing the number of stations for a given cycle time (called type one), or minimizing the cycle time for a given number of stations (called type two). Rarely, type E of the problem has been considered. In the type E, cycle time and number of stations are both decision variables, and the objective is to maximize the line efficiency. This paper presents a mixed integer linear programming formulation for the type E simple assembly line balancing problem. Moreover, to further strengthen the presented formulation, two enhancement techniques in the form of valid inequalities and auxiliary variables are proposed. As the secondary objectives of the problem, minimization of the number of stations, the cycle time, and the smoothness index are studied as well. In the case of workload smoothing, three different linearization methods are employed and compared for minimizing the smoothness index. The results of computational study on the benchmark data set demonstrate the efficacy of the improved formulation (C) 2015 Elsevier Ltd. All rights reserved.
机译:尽管简单的流水线平衡问题(SALBP)是许多研究的主题,但通常,他们要么考虑在给定的循环时间内最小化工位数量(称为第一类),要么在给定的一定数目的工位时间内最小化周期时间(称为第一类)。类型2)。很少考虑问题的类型E。在类型E中,周期时间和站数都是决策变量,目的是使线路效率最大化。本文提出了一种用于E型简单装配线平衡问题的混合整数线性规划公式。此外,为了进一步加强所提出的公式,提出了两种有效形式的有效不等式和辅助变量的增强技术。作为该问题的次要目标,还研究了最小化站数,循环时间和平滑度指标。在工作负载平滑的情况下,采用了三种不同的线性化方法并进行了比较,以最小化平滑度指标。对基准数据集的计算研究结果表明,改进的配方(C)2015 Elsevier Ltd.的功效。保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号