...
首页> 外文期刊>The clean fuels and electric vehicles report >U.S. STATE DEPARTMENT ISSUES FINAL EIS FOR THE KEYSTONE XL OIL PIPELINE
【24h】

U.S. STATE DEPARTMENT ISSUES FINAL EIS FOR THE KEYSTONE XL OIL PIPELINE

机译:美国国务院向KEYSTONE XL油管道发布最终EIS

获取原文
获取原文并翻译 | 示例
           

摘要

In September 2008, TransCanada Keystone Pipeline, LP filed an application for a Presidential Permit with the United States (U.S.) Department of State (DOS) to build and operate the Keystone XL Project. The proposed project would have the capacity to transport roughly 700,000 barrels per day (bpd) of crude oil from a supply hub in Hardisty, Alberta, Canada, to delivery points in Oklahoma and Texas. The pipeline would consist of approximately 1,711 miles of new 36 inch diameter pipeline, with approximately 327 miles of pipeline in Canada and 1,384 miles in the U.S. The U.S. portion of the pipeline would begin near Morgan, Montana, at the international border and extend to delivery points in Nederland and Moore Junction, Texas. There would also be a delivery point at Cushing, Oklahoma.
机译:2008年9月,TransCanada Keystone Pipeline,LP向美国(美国)国务院(DOS)提交了一份总统许可申请,以建设和运营Keystone XL项目。拟议的项目将有能力每天将大约700,000桶(bpd)的原油从加拿大艾伯塔省Hardisty的供应枢纽运输到俄克拉荷马州和德克萨斯州的交货点。该管道将​​包括约1,711英里的新直径36英寸的管道,其中加拿大约327英里,美国约1,384英里。管道的美国部分将从国际边界的蒙大拿州摩根附近开始,并延伸至交付在得克萨斯州的Nederland和Moore交界处设置点。在俄克拉何马州的库欣(Cushing)也将有一个交付点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号