...
首页> 外文期刊>Civil Engineering >Construction of the Port of Ngqura: Phase 2: Maritime and Civil Works, November 2006 to May 2011
【24h】

Construction of the Port of Ngqura: Phase 2: Maritime and Civil Works, November 2006 to May 2011

机译:Ngqura港口建设:第2阶段:海事和土建,2006年11月至2011年5月

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Port of Ngqura is a new deepwater port located on South Africa's east coast. The port started operations on 4 October 2009 and consists of two container berths, with a further two due for completion in May 2011 (excluding dredging), two bulk / breakbulk berths and a liquid bulk berth. The port is ideally positioned to deal with container import and export from across the globe, as well as transhipment cargoes serving east and west coast traffic and also inter-line traffic from South America to Asia.
机译:Ngqura港口是位于南非东海岸的新深水港口。该港口于2009年10月4日开始运营,包括两个集装箱泊位,另外两个将于2011年5月完工(不包括疏)),两个散装/杂货泊位和一个液体散装泊位。该港口地理位置优越,可以处理来自全球的集装箱进出口,以及为东西海岸运输以及从南美到亚洲的线间运输提供转运的货物。

著录项

  • 来源
    《Civil Engineering》 |2010年第7期|p.40-49|共10页
  • 作者

    Gerrit du Plessis;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号