首页> 外文期刊>Civil Engineering >Substantial Completion: Submittal Requirements Count
【24h】

Substantial Completion: Submittal Requirements Count

机译:实质性完成:提交要求计数

获取原文
获取原文并翻译 | 示例
       

摘要

The substantial completion date on a project is considered by some to be the proverbial "day of reckoning." For contractors, liquidated damages and early completion bonuses and warranties are triggered by the date. Likewise, owners typically assume control of their "near-final" projects at this time, relinquish remaining retention, and conclude services with their architects and engineers. With so much at stake, the definition of "substantial completion" warrants careful study. In a recent decision, Appeal of Ellis Environmental Group, lc, the Armed Services Board of Contract Appeals (asbca) considered whether a contractor had achieved substantial completion despite the fact that certain technical requirements had not been satisfied. In June 2004 the Naval Facilities Engineering Command awarded a design/build contract to Ellis Environmental to construct diesel exhaust ventilation systems in certain fire stations around Florida's Naval Air Station Jacksonville. The project was to be substantially completed in five months.
机译:有人认为某个项目的实质性完成日期是众所周知的“清算日”。对于承包商,违约金以及提早完成的奖金和担保会在该日期之前触发。同样,所有者通常会在此时承担对其“准最终”项目的控制,放弃剩余的保留权,并与建筑师和工程师结束服务。如此危急,“实质完成”的定义值得认真研究。在最近的一项决定中,武装合同合同委员会(Els环境小组,Ellis Environmental Group,lc)呼吁,尽管某些技术要求没有得到满足,但承包商是否已经实现了实质性的完成。 2004年6月,海军设施工程司令部与Ellis Environmental签订了设计/建造合同,以在佛罗里达州杰克逊维尔海军航空站周围的某些消防局建造柴油机排气通风系统。该项目将在五个月内基本完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号