...
首页> 外文期刊>Civil Engineering >BRT bridge gets AfriSam's concrete support
【24h】

BRT bridge gets AfriSam's concrete support

机译:BRT桥获得AfriSam的具体支持

获取原文
获取原文并翻译 | 示例
           

摘要

Leading concrete solutions company AfriSam has played an integral part in the construction of the attractive and highly visible cable-stayed bridge crossing one of South Africa's busiest highways, the M1, between the Grayston Drive and Marlboro Drive off-ramps in Johannesburg. The 258 m bridge is part of the Rea Vaya Bus Rapid Transport (BRT) system linking Sandton, Alexandra and the Johannesburg central business district (CBD). This project sees the City of Johannesburg rolling out 'eco-mobile' infrastructure to improve mobility for commuters. The location of the bridge creates a link between Katherine Street in Sandton and Old Pretoria Road in Wynberg, which takes traffic towards the Johannesburg CBD.
机译:领先的混凝土解决方案公司AfriSam在约翰内斯堡Grayston Drive和Marlboro Drive匝道之间穿越南非最繁忙的高速公路之一的M1的引人入胜且引人注目的斜拉桥的建设中发挥了不可或缺的作用。这座长258 m的桥是Rea Vaya快速公交(BRT)系统的一部分,该系统连接桑顿,亚历山德拉和约翰内斯堡中央商务区(CBD)。该项目使约翰内斯堡市推出了“生态移动”基础设施,以改善通勤者的出行方式。这座桥的位置在桑顿的凯瑟琳街和温伯格的老比勒陀利亚路之间建立了一条连接,将交通引向约翰内斯堡中央商务区。

著录项

  • 来源
    《Civil Engineering》 |2017年第5期|5-7|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号