首页> 外文期刊>Canal boat and inland waterways >L&L water restrictions abolished
【24h】

L&L water restrictions abolished

机译:取消L&L用水限制

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

It might have been a disappointing summer for sun-seekers, but at least the wet weather has meant that lock hours restrictions in force on the leeds & liverpool canal since the spring could be lifted. In late june it appeared likely that 'second tier' restrictions might see the overnight closures extended to three more flights but, by the end of july, reservoir stocks had recovered to 57.6 percent of capacity (twice as much as at the same time last year), allowing british waterways to end the limits at greenberfield and barrowford locks.
机译:对于寻求阳光的人来说,这可能是一个令人失望的夏天,但至少由于潮湿的天气,自春季可以解除以来,对利兹和利物浦运河的锁定时间限制已经生效。在6月下旬,似乎“二级”限制可能会导致隔夜关闭扩大到另外三个航班,但是到7月底,水库库存已恢复到容量的57.6%(是去年同期的两倍) ),允许英国水道结束格林伯菲尔德和巴罗福德船闸的限制。

著录项

  • 来源
    《Canal boat and inland waterways》 |2011年第9期|p.11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号