...
【24h】

Partnership Chair resigns

机译:伙伴关系主席辞职

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A new partnership Chair for the Kennet & Avon Waterways Partnership is being sought by the Canal & River Trust after Fleur de Rhe-Philipe stood down as a result of her professional commitments. Ms de Rhe-Philipe was one of the three Partnership Chairs to be appointed in 2011 to head up 'trial partnerships' in advance of the establishment of the fully-fledged regional partnerships in early 2012. She said it was "with some regret" that she was stepping down, but that it was becoming "difficult to give the role the level of attention I feel it deserves". Launching the recruitment of a successor, CRT Head of Governance Services Roger Hanbury called it "an exciting role in a new charity". CRT said the Partnership, which covers the Bridgwater & Taunton as well as the K&A, played a "key part in shaping" how the canals were run, and was "helping to give people a greater role in looking after their local waterways". The Full T&M reopening put back until May THE BREACH AT Dutton which closed the north end of the Trent & Mersey Canal last September is now expected to take until May to repair. Although major engineering work got under way in January following planning and access road construction, the nature of the material used for construction of the embankment proved to be less suitable for re-use than had been hoped. This has meant an increased amount of stone has needed to be brought in - several thousand tons in all - in order for the embankment to be rebuilt to a standard which will make it sufficiently self-draining to prevent a recurrence of the waterlogged ground which led to the failure. The extra time taken to lay this stone means that the hoped-for Easter opening date (which CRT says was always "aspirational" rather than a formal plan) has now slipped back, and the canal is likely to open in late May.
机译:Fleur de Rhe-Philipe因其职业承诺而辞职后,Canal&River Trust正在寻求Kennet&Avon Waterways Partnership的新合伙关系主席。 de Rhe-Philipe女士是2011年任命的三位合伙人主席之一,负责在2012年初建立成熟的地区合伙人之前领导“审判合伙人”。她说,她感到“遗憾”她辞职了,但是变得“很难让这个角色获得我认为应该得到的关注”。 CRT治理服务主管Roger Hanbury发起了继任者的招聘,称其为“新慈善机构中令人兴奋的角色”。 CRT说,涵盖Bridgwater和Taunton以及K&A的合作伙伴关系在塑造运河的运行方式方面发挥了“关键作用”,并且“正在帮助人们在照顾当地水道方面发挥更大的作用”。全面的T&M重新开放时间将持续到5月。达顿(Dutton)的断裂已于去年9月关闭了特伦特和默西运河的北端,现在预计要到5月才能修复。尽管计划和通道建设之后,1月份进行了主要的工程工作,但事实证明,用于建造路堤的材料的性质不如预期的那样适合再利用。这意味着需要引入更多数量的石材-总共要数千吨-才能将路堤重建到一个标准,这将使其充分自排水以防止水淹地面的再次发生,这导致了失败。铺设这块石头需要花费额外的时间,这意味着希望的复活节开放日期(CRT说这始终是“理想的”,而不是正式的计划)现在已经退缩了,运河很可能在五月下旬开放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号