首页> 外文期刊>Canal boat and inland waterways >...As Aylesbury and the Leeds & Liverpool open
【24h】

...As Aylesbury and the Leeds & Liverpool open

机译:...艾尔斯伯里(Aylesbury)和利兹和利物浦(Liverpool)开业

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Two emergency stoppages were due to end in late November, with both the Leeds & Liverpool and Grand Union Aylesbury Arm scheduled to open by the end of the month. On the Leeds & Liverpool at Rishton the canal bed and towpath have been reinstated where they were washed out by leakage into a culvert carrying a stream under the canal. The canal bed has been re-lined with traditional puddled clay, the puddle protected by a layer of stone, and the only remaining work as we went to press was installation of the new culvert liner and surfacing of the towpath. Reopening was expected on 25 November.
机译:两次紧急停工将在11月下旬结束,利兹和利物浦和大联盟艾尔斯伯里分队计划于本月底开放。在里斯顿(Rishton)的利兹和利物浦(Leeds&Liverpool),河床和拖船已经恢复原状,在那儿,它们因泄漏入涵渠下的小河而被冲洗掉。运河床已重新铺上传统的泥浆土,水坑被一层石头保护,而我们付印时剩下的唯一工作是安装新的涵洞衬板和拖曳路面。预计将于11月25日重新开放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号