首页> 外文期刊>Canal boat and inland waterways >WRG targets the Chesterfield
【24h】

WRG targets the Chesterfield

机译:WRG瞄准切斯特菲尔德

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Four worksites on two canals attracted more than 70 volunteers to Waterway Recovery Group's annual Reunion, an annual major working party which this year was based around Killamarsh on the Chesterfield Canal. Volunteers tackled trees and vegetation at three locations on the canal - the eastern approach to Norwood Tunnel at the current limit of navigation from the Trent; the next length of canal beyond the newly opened Staveley Town Lock at the end of the restored Staveley to Chesterfield length; and on the length of canal between these sites at Renishaw. In addition, a group headed off to the Cromford Canal to surface a length of towpath at Ironville Locks.
机译:两条运河上的四个工地吸引了70多名志愿者参加水路恢复集团的年度留尼旺聚会,该聚会是每年的主要工作小组,今年的工作小组是在切斯特菲尔德运河上的基拉马什附近举行的。志愿者在运河的三个位置处抢夺树木和植被-在目前从特伦特海峡航行的极限处,通往诺伍德隧道的东部通道;在恢复的斯塔夫利至切斯特菲尔德的尽头处,新开通的斯塔夫利镇闸之后的下一条运河长度;在雷尼绍这些站点之间的运河长度上。此外,还有一群人前往克罗姆福德运河,在艾恩维尔洛克斯(Ironville Locks)上拖曳了一段拖曳路径。

著录项

  • 来源
    《Canal boat and inland waterways》 |2017年第1期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号