...
【24h】

MARINA PLANS ON HOLD?

机译:码头计划是否搁置?

获取原文
获取原文并翻译 | 示例
           

摘要

A planning application for a new marina on the Oxford Canal, opposed by some local people and marina operators, has been withdrawn. Plans were submitted in 2017 for a new 250-berth site on the summit at Glebe Farm, Claydon. Its supporters said it would support the local economy, mitigate the effects of the HS2 railway which would cut through the farm making agriculture less viable, and that it was the only one of 14 sites considered which was viable. Opponents argued that its traffic would overload local roads, that there were few facilities for boaters to use, that there were already ample nearby marinas, and that it would be out of character.
机译:牛津运河新码头的规划申请已被一些当地人和码头经营者反对。 2017年提交了在Claydon的Glebe Farm的山顶上新建250个泊位的计划。它的支持者表示,它将支持当地经济,减轻HS2铁路的影响,该铁路将切断农场,使农业不可行,并且它是被认为可行的14个站点中的唯一一个。反对者争辩说,它的交通将使当地道路超载,船员使用的设施很少,附近的码头已经足够,这将不合时宜。

著录项

  • 来源
    《Canal boat and inland waterways》 |2019年第12期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号