...
首页> 外文期刊>Canadian Consulting Engineer >Dialogue Leads Differing Perspectives to Common Ground
【24h】

Dialogue Leads Differing Perspectives to Common Ground

机译:对话将不同的观点引向共同点

获取原文
获取原文并翻译 | 示例
           

摘要

This issue's theme is applicable to the relationship between the construction industry and the consulting engineering sector; like any relationship, each brings a different perspective to the table. But differing perspectives can strengthen the relationship depending on how it is approached. ACEC and the Canadian Construction Association (CCA), meet regularly to discuss the challenges that impact our respective industries. As incoming Chair, I had the opportunity to participate in meetings with CCA, an experience I found valuable to increasing my understanding of how our organizations collaborate on shared challenges. It also showed me to a different viewpoint on matters such as fees, schedules, and owner issues. A recent example of varied perspective between our sectors is the perceived challenges with quality and incompleteness of some construction documents. After 12 cross-country workshops and an anonymous survey by participants, CCA's viewpoint was that some of the contributing factors include incomplete or unclear project scope and insufficient design resources (i.e. insufficient design fees and schedule).
机译:本期的主题适用于建筑业与咨询工程部门之间的关系;像任何关系一样,每种关系都为表格带来了不同的视角。但是,不同的观点可以根据这种关系的方式来加强这种关系。 ACEC和加拿大建筑协会(CCA)定期开会,讨论影响我们各自行业的挑战。作为即将上任的主席,我有机会参加了与CCA举行的会议,这次经历对我加深我对我们的组织如何应对共同挑战的理解非常有价值。这也使我对费用,时间表和所有者问题等问题有了不同的看法。我们部门之间观点不同的一个最新例子是一些建筑文件的质量和不完整所带来的挑战。经过12次越野研讨会和参与者的匿名调查后,CCA的观点是某些促成因素包括项目范围不完整或不清楚,以及设计资源不足(即设计费用和进度不足)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号