首页> 外文期刊>Buses >Shuttles required to circumnavigate major road works closures
【24h】

Shuttles required to circumnavigate major road works closures

机译:应对主要道路工程封锁的班车

获取原文
获取原文并翻译 | 示例
       

摘要

Meanwhile, gas or water main replacement continue to leave much of London with road closures, diversions and delays. Some of the bus diversions are so far off normal route that replacement shuttle services are provided. One recent example was route 541 (Canning Town-Keir Hardie Estate), worked with a Stagecoach East London double-decker when neither the 147 (Ilford-Canning Town) nor 241 (Stratford-Canning Town) could serve the estate. Nearer my own home was another diversion and shuttle service when the 466 (Addington Village-Caterham-on-the-Hill) was diverted well away from its normal route between Coulsdon and Old Coulsdon.
机译:同时,天然气或水的主要替代品继续因道路封闭,改道和延误而离开伦敦大部分地区。有些公交车改道偏离正常路线,因此提供了替代班车服务。最近的一个例子是路线541(坎宁镇-基尔·哈迪庄园),与147马车(伊尔福德-坎宁镇)或241(斯特拉特福德-坎宁镇)都无法为该庄园服务,并且与驿马车东伦敦双层巴士一起使用。当466号公路(位于山丘上卡特勒姆的阿丁顿村)从正常的库尔斯顿和旧库尔斯顿之间的路线转移时,离我家较近的地方是另一条改道和班车服务。

著录项

  • 来源
    《Buses》 |2011年第679期|p.23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:52:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号