首页> 外文期刊>Bulletin >Upgrading Ormesa
【24h】

Upgrading Ormesa

机译:升级Ormesa

获取原文
获取原文并翻译 | 示例
       

摘要

The East Mesa geothermal power facility lies a few miles east of El Centro in southern California's Imperial Valley. Its moderate-temperature (300° to 375℉) resource is associated with the tectonic environment of the Salton Trough. After initial exploration efforts in the 1960s and 1970s, ORMAT (Sparks, NV) developed the field with the 24-megawatt (MW) Ormesa I project completed in 1986. By 1998, the facility was expanded by an additional 42-MW with ORMAT's Ormesa projects. In the years since then, the Geo East Mesa (GEM) and Ormesa operations were reliable power producers, but aging equipment and wells―and third party ownership and operation―led to inefficiencies in both geothermal fluid and power production.
机译:East Mesa地热发电设施位于加利福尼亚南部帝国谷的El Centro以东几英里处。其中等温度(300°至375℉)资源与Salton槽的构造环境有关。经过1960年代和1970年代的初步勘探工作,ORMAT(内华达州斯帕克斯)开发了该领域,并于1986年完成了24兆瓦(兆瓦)的Ormesa I项目。到1998年,该设施与ORMAT的Ormesa一起又扩展了42兆瓦。项目。从那以后的几年中,Geo East Mesa(GEM)和Ormesa的运营是可靠的电力生产商,但设备和井的老化以及第三方所有权和运营导致地热流体和电力生产效率低下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号