Upgrading Ormesa Geothermal Operations

机译:升级Ormesa地热操作

获取原文

摘要

The first two wells drilled at East Mesa were petroleum exploration wells drilled in the 1960s. Between 1972 and 1974, five deep wells were drilled at East Mesa by the US BOR. These wells, whose locations were suggested by surface geophysical studies, confirmed the existence of the East Mesa thermal anomaly and had bottomhole temperatures ranging from 300 deg to 400 deg F. In 1975 - 1976, Republic Geothermal drilled three wells in the northern part of the field, confirming the extension of commercial temperatures, and proceeded in 1977 to drill seven additional confirmation wells. In late 1984 ORMAT purchased the development rights to the East Mesa geothermal resource area, along with the assignment of the Republic Geothermal's SO4 power sales agreements and acess to a DOE Loan guaranty. Subsequently ORMAT developed East Mesa Project, with a dollar50 million guaranteed loan for the 24 MW Ormesa I project, which was prepaid in full approximately one year after this loan was funded. With its December 1986 grid synchronization and subsequent continued successful operation, the Ormesa I project established the technical feasibility of larger scale commercial modular binary power plants and liquid dominated geothermal resources. From 1986 on. the East Mesa projects were expanded by: (a) the 20 MW Ormesa II project in 1998; (b) the 10 MW Ormesa IE project in 1988 and (c) the 12 MW Ormesa IH project in 1989. In April 2002, after sixteen years of third party ownership and operation, ORMAT acquired a 100percent interest in the four Ormesa binary power plants as well as the two adjacent Geo East Mesa (GEM) single flash power plants and the entire well field which supports these plants. The GEM plants did not have a power sales agreement and are supplying plant usage power to the four Ormesa power plants and the associated well field pumps. ORMAT eliminated the multi-entity field ownership, which constrained effective field management. By operating the well field to optimize power production, and replacing 20 of the original 1 MW ORMAT~(~R) Energy Converter (OEC) units in Ormesa 1 with two new high efficiency 10 MW OEC/ITLU units, the power production of the Ormesa complex has been increased from an average of 42 MW to over 55 MW, without drilling any new wells. This is a shining example of the benefits of a single, value-added upgraded plant and field operations and management program.
机译:在East Mesa钻的前两头井是20世纪60年代钻探的石油勘探井。 1972年至1974年间,美国BOR在East Mesa钻了五个深井。这些井,其位置是通过表面地球物理学研究提出的,证实了东部MESA热异常的存在,并且在1975年至1976年,共和国地热钻了井地的井地温度范围从300°至400°F。现场,确认商业温度的延伸,并于1977年进行,探讨七个额外的确认井。 1984年底,Ormat购买了东部MESA地热资源领域的发展权,以及共和国地热的SO4电力销售协议和ACES向DOE贷款担保的转让。随后Ormat开发了East Mesa项目,为24 MW Ormesa I项目担保贷款,在本贷款资助后大约一年内预付一年。随着1986年12月的电网同步和随后的持续成功运营,Ormesa I项目建立了大规模商业模块化电厂和液体主导地热资源的技术可行性。从1986年开始。东台MESA项目被揭示:(a)1998年20兆瓦奥姆塞二世项目; (b)1988年的10 MW Ormesa IE项目,1988年,1989年12兆瓦Ormesa IH项目。2002年4月,在十六年的第三方所有权和运营后,Ormat在四个Ormesa二元电厂获得了100强的利益以及两个相邻的Geo East Mesa(Gem)单闪发电厂和支持这些植物的整个井场。宝石厂没有动力销售协议,并为四个矿石发电厂和相关井场泵供应厂使用电力。 ORMAT消除了多实体实地所有权,限制了有效的现场管理。通过操作井场来优化电力生产,并用两种新的高效10 MW OEC / ITLU单位,替换原装1 MW Ormat〜(〜〜r)能量转换器(OEC)单元的20个,电源生产Ormesa Complex从平均增加到超过55兆瓦的平均增加,而不会钻出任何新井。这是一个闪亮的例子,具有单一增值升级的植物和现场操作和管理程序的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号