Russia's FESCO Transportation Group and Erdenes Tavan Tolgoi (ETT), the operator of Mongolia's largest coalfield, have agreed to jointly construct a coal export terminal at the Russian Pacific harbour of Zarubino. The first phase, offering capacity of 6 Mtpa, is scheduled for construction between 2020 and 2023. However, the preliminary technical and economic feasibility study suggests capacity would later be increased to 10 Mtpa.
展开▼
机译:俄罗斯的FESCO运输集团和蒙古最大的煤田运营商Erdenes Tavan Tolgoi(ETT)已同意在俄罗斯太平洋Zarubino港口共同建设煤炭出口码头。第一阶段的产能为6 Mtpa,计划于2020年至2023年之间进行建设。但是,初步的技术和经济可行性研究表明,此后的产能将提高至10 Mtpa。
展开▼