...
首页> 外文期刊>Bulk materials international >Re-berth for Port Augusta
【24h】

Re-berth for Port Augusta

机译:奥古斯塔港再泊位

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

South Australia's long dormant Port Augusta will be revived as a bulk commodity transhipment facility, under a A$250M plan by magnetite miner Cu-River Mining. The company has agreed to purchase Flinders Power's decommissioned 1,068-ha power station site in the Upper Spencer Gulf for conversion to the new purpose as soon as feasibility and approvals processes are complete. The retention of key infrastructure at the site, including a 5 km rail loop and unloading systems, made the site an attractive proposition for Cu-River.
机译:根据磁铁矿商Cu-River Mining计划以2.5亿澳元的计划,南澳大利亚州长期处于休眠状态的奥古斯塔港将恢复为散装商品转运设施。该公司已同意购买Flinders Power在Spencer海湾上空的1,068公顷退役电站,一旦可行性和批准程序完成,便将其转换为新用途。该站点关键基础设施的保留,包括5公里的铁路环路和卸货系统,使该站点成为Cu-River有吸引力的提议。

著录项

  • 来源
    《Bulk materials international》 |2019年第janaafeba期|1-1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号