...
【24h】

Two for Elecon

机译:两个为Elecon

获取原文
获取原文并翻译 | 示例

摘要

Elecon Engineering of India has been awarded two major contracts for coal handling plant in its domestic market. The first is a US$92.6M order from the Damodar Valley Corp for coal handling equipment for the second phase of the Mejia Thermal power Station in Kolkata. Phase II consists of two 500MW generators and the supporting coal handling equipment to handle coal at 1250tph, including two stacker reclaimers and 27 conveyors.
机译:印度Elecon Engineering公司已在其国内市场上获得了两个主要的煤炭处理厂合同。第一是来自Damodar Valley Corp的价值9,260万美元的订单,用于加尔各答Mejia热电厂第二期的煤炭处理设备。第二阶段包括两台500MW发电机和配套的煤炭处理设备,以处理1250tph的煤炭,包括两个堆取料机和27个输送机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号