Spoilt for choice

机译:宠坏了选择

获取原文
获取原文并翻译 | 示例
       

摘要

Third-party right schedules have been much debated since the implementation of the Contracts (Rights of Third Parties) Act 1999, but until now few people have actually written them into their contracts. The JCT's design-and-build form includes provisions for third-party rights schedules and for the collateral warranties that they are proposed to replace. Will this sea change in standard construction contracts tip the balance in favour of use of third-party right schedules? The form includes options for the contractor to provide either a collateral warranty or to extend rights detailed in schedules to a purchaser, tenant and funder. A similar approach is adopted in the recently published British Property Federation Consultancy Agreement and is expected to be followed by the Construction Industry Council.
机译:自《 1999年合同(第三方权利)法》实施以来,第三方权利计划一直存在很多争议,但直到现在,很少有人真正将其写入合同中。 JCT的设计和建造表格包括有关第三方权利计划的条款以及拟将其取代的附带担保的条款。标准建设合同中的这种巨大变化是否会为使用第三方权利计划而使收支平衡?该表格包括供承包商选择提供抵押担保或将附表中详细说明的权利扩展至购买者,租户和出资者的选项。最近发布的《英国房地产联合会顾问协议》采用了类似的方法,预计建筑行业委员会将遵循该方法。

著录项

  • 来源
    《Building》 |2005年第8399期|p.78|共1页
  • 作者

    Helen Garthwaite;

  • 作者单位

    Law firm Taylor Wessing;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:39:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号