首页> 外文期刊>Building >Fractal law
【24h】

Fractal law

机译:分形定律

获取原文
获取原文并翻译 | 示例
       

摘要

In this dispute it was ever so important to know the date when an adjudication was commenced. Was it when the "notice of adjudication" was fired off? Or was it when the "referral" - being the full story - was fired off? Or was it when a new "notice of adjudication" was fired off because the referral after the first notice had arrived late? The word "nitpicking" comes to mind. Blame lawyers. Blame the folk who cobble together fancy forms of contract. Each clause in standard forms contains a lawyer's fee note. Mr Tracy Bennett decided to refurbish a house. He contracted with FMK Construction. The bumf included the JCT98 standard form. Builder and client fell out. Actually that's not quite accurate. The builder fell out with the ringmaster.
机译:在这场争执中,知道裁决的开始日期是如此重要。是“裁定通知书”被开除吗?还是当“引荐”(即全文)被开除时?还是因为第一次通知后的转介晚而发出新的“裁决通知”?想到“挑剔”这个词。怪罪律师。责怪那些凑齐幻想形式的契约的人。标准格式的每个条款均包含律师费说明。特雷西·贝内特(Tracy Bennett)先生决定翻新房屋。他与FMK Construction签约。污点包括JCT98标准格式。建造者和客户摔倒了。实际上,这不是很准确。建造者和表演指导员摔倒了。

著录项

  • 来源
    《Building》 |2005年第8393期|p.41|共1页
  • 作者

    Tony Bingham;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:39:26

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号