首页> 外文期刊>Building >School extensions
【24h】

School extensions

机译:学校扩展

获取原文
获取原文并翻译 | 示例
           

摘要

Davis Langdon has published cost models in Building since 1994 and more than 60 cost models and updates have appeared since then. However, most of these have covered large-scale projects. Recent reader feedback has led to the development of a mini-cost model series, focused on projects up to about £1 m in value. With the continued high levels of spending on education this first model looks at the primary schools sector, with the spotlight on classroom block extensions. The government's continued commitment to investment in school buildings has led to a total capital expenditure of £5.2bn in 2005/06, of which £500m will fund improvements to primary schools.
机译:戴维斯·兰登(Davis Langdon)从1994年开始在Building中发布成本模型,此后出现了60多种成本模型和更新。但是,其中大多数涵盖了大型项目。最近读者的反馈导致开发了微型成本模型系列,重点是价值最高约100万英镑的项目。随着教育支出的持续高位,第一个模型着眼于小学部门,并着重于教室的扩展。政府对学校建筑投资的持续承诺,导致2005/06年度总资本支出为52亿英镑,其中5亿英镑将用于改善小学。

著录项

  • 来源
    《Building》 |2006年第8421期|p.66-69|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号