...
首页> 外文期刊>Building >Galliford Try sued by Prater over 2012 village delays
【24h】

Galliford Try sued by Prater over 2012 village delays

机译:加里福德·特里(Palter)因2012年乡村延误起诉

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Galliford Try is facing a second High Court battle with a subcontractor over delays during construction of the London 2012 athletes village, Building has learned. Cladding contractor Prater lodged a £4.4m claim against Galliford Try last month, it has emerged, alleging the contractor "presided over a chaotic and shambolic site", causing delays and losses to Prater. The claim relates to delays on the final two plots of the athletes village, N13 and N26 where Galliford Try was the main contractor. The plots were together worth £80m and comprised 14 blocks and 423 units, according to construction analyst Barbour ABI.
机译:大厦获悉,加里福德·特里(Galliford Try)因与2012年伦敦奥运会运动员村建设的延误而面临与分包商的第二次高等法院之战。包覆承包商Prater上个月向Galliford Try提出了440万英镑的索赔要求,该索赔已经出现,称承包商“主持了一个混乱而残酷的现场”,给Prater造成了延误和损失。索赔涉及延误了运动员村的最后两个地块,N13和N26,加里福德·特里是主要承包商。根据建筑分析家Barbour ABI的说法,这些土地总价值8000万英镑,包括14个街区和423个单位。

著录项

  • 来源
    《Building》 |2013年第48期|11-11|共1页
  • 作者

    Iain Withers;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号