首页> 外文期刊>Construction News >Subcontractor sues Galliford Try over Inverness depot termination
【24h】

Subcontractor sues Galliford Try over Inverness depot termination

机译:分包商起诉加里福德(Galliford),尝试因弗内斯仓库终止

获取原文
获取原文并翻译 | 示例
           

摘要

Leeds-based specialist contractor Lanes Group has brought a claim worth at least £1.6 million against Galliford Try Infrastructure over a project at Inverness Train Depot. Galliford Try hired Lanes as a subcontractor for roofing work on the project, while itself acting as subcontractor to main contractor Network Rail. Barton Legal partner Bill Barton, acting on behalf of Lanes, said the case was a "classic construction claim involving wrongful determination, extensions of time, and loss and expense claims".
机译:总部位于利兹的专业承包商Lanes Group就因弗内斯火车站(Inverness Train Depot)的一个项目,向加利福德Try基础设施公司索赔至少160万英镑。 Galliford Try聘请Lanes作为该项目屋面工程的分包商,而其本身又是主要承包商Network Rail的分包商。巴顿法律合伙人比尔·巴顿(Bill Barton)代表Lanes表示,此案是“涉及错误确定,延长时间以及损失和费用索赔的经典建筑索赔”。

著录项

  • 来源
    《Construction News》 |2010年第7198期|p.10|共1页
  • 作者

    JACK SIDDERS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号