首页> 外文期刊>Building >TIME TO GO BACK TO SCHOOL?
【24h】

TIME TO GO BACK TO SCHOOL?

机译:有时间回到学校吗?

获取原文
获取原文并翻译 | 示例
           

摘要

The shortfall of school places in England, and the thousands of school buildings in stages of disrepair, are twin problems that the country has faced for over a decade. And despite the billions of pounds that have been ploughed into trying to address this crisis, the problem is far from being resolved. When the previous government's £55bn Building Schools for the Future programme was cancelled, back in 2010, two thirds of the UK's secondary schools were without investment - a fact that has led to a deluge of applications for its much smaller-scale replacement, the Priority Schools Building Programme (PSBP). In addition, population expansion means there is a dire shortage of school places, particularly at primary level. Estimates produced in 2012 indicated that an extra 800,000 primary places would be needed by 2020.
机译:英格兰的学位短缺,以及成千上万座处于失修状态的教学楼,是英国十多年来面临的双重问题。尽管已经投入数十亿英镑试图解决这场危机,但问题远未得到解决。上一届政府斥资550亿英镑的“未来学校建设”计划被取消时,早在2010年,英国三分之二的中学都没有投资,这一事实导致大量申请进行小规模的替代,“优先”学校建设计划(PSBP)。此外,人口膨胀意味着学校的学额严重短缺,尤其是在小学阶段。 2012年的估算表明,到2020年,将需要再增加80万个初级学位。

著录项

  • 来源
    《Building》 |2014年第35期|22-24|共3页
  • 作者

    Sarah Richardson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号