首页> 外文期刊>Building >Keltbray approached about demolishing Pinnacle tower'stump'
【24h】

Keltbray approached about demolishing Pinnacle tower'stump'

机译:凯尔特布雷(Keltbray)着手拆除Pinnacle塔的“树桩”

获取原文
获取原文并翻译 | 示例
       

摘要

Demolition contractor Keltbray has been sounded out on the potential demolition of London's stalled Pinnacle "stump" the firm's owner Brendan Kerr has revealed. Demolishing the seven storeys of concrete core on site - abandoned since 2012, earning the development the "stump" nickname - would enable a substantial redesign of the project. The Saudi Arabian owners of the Pinnacle are currently marketing the skyscraper to potential investors via property agent CBRE to try to revive the scheme, which has been lying dormant since the beginning of 2012 after finance dried up. Interested parties have been asked to work with a revised version of the existing design drawn up by Kohn Pedersen Fox, but Building understands rival teams are considering more significant design changes, which could necessitate demolishing existing work on site.
机译:拆迁承包商凯尔特布雷(Keltbray)已被爆出,该公司的所有者布伦丹·科尔(Brendan Kerr)透露,伦敦停滞的Pinnacle“树桩”可能被拆除。自2012年以来废弃了七层高的混凝土核心层,为该项目赢得了“树桩”的绰号,这将使该项目得到实质性的重新设计。品尼高酒店的沙特阿拉伯业主目前正在通过房地产经纪人世邦魏理仕(CBRE)向潜在投资者出售摩天大楼,以试图重振该计划。自2012年初金融枯竭以来,该计划一直处于休眠状态。有兴趣的人士被要求使用Kohn Pedersen Fox拟定的现有设计的修订版进行工作,但是Building了解到竞争对手的团队正在考虑进行更重大的设计更改,这可能需要拆除现场的现有工作。

著录项

  • 来源
    《Building》 |2014年第3期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:33:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号