首页> 外文期刊>Building >A new approach could stop PI costs spiralling
【24h】

A new approach could stop PI costs spiralling

机译:一种新的方法可以阻止PI成本螺旋

获取原文
获取原文并翻译 | 示例
           

摘要

Significant increases in insurance premiums have raised stress levels across the construction industry. I recently heard of one business being quoted a premium of £75,000 for £im worth of professional indemnity cover! Professional indemnity (PI) insurance is a form of performance-related assurance which, for contractors, comes on top of other performance securities such as bonds, retentions and guarantees. The Grenfell Tower tragedy may have been the spur for recent rises but PI premiums have been increasing steadily for some years - and the impact is falling most heavily on small and medium firms in construction supply chains. Most companies are required under contracts/ warranties to keep PI cover in place for 12 years. As balance sheets continue to deteriorate, insurers have become even more reluctant to provide cover and, if they do, a large excess is usually required. Before we run off to rough up a few insurers, we need to reflect carefully on one crucial factor: the problems we are experiencing with PI are the result of a traditional construction/ infrastructure procurement process driven by a lowest price culture - and the need to effect wholesale risk transfer.
机译:保险费的显着增加在建筑业中提高了压力水平。我最近听说过一个企业为£的专业赔偿封面引用了75,000英镑的溢价!专业赔偿(PI)保险是一种绩效相关保证的形式,其为承包商而言,债券,保留和担保等其他性能证券之外。 Grenfell Tower Tragagey可能是最近升起的刺激,但PI Premium多年来一直在稳步增长 - 并且影响在施工供应链中的中小企业中的影响最大地下降。大多数公司都是根据合同/保证所必需的,以保持PI掩护12年。由于资产负债表继续恶化,保险公司已经更加不愿意提供封面,并且如果他们这样做,通常需要大量超额。在我们冒犯了一些保险公司之前,我们需要仔细反思一个关键因素:我们与PI遇到的问题是由最低价格文化驱动的传统建筑/基础设施采购过程的结果 - 以及需要的传统建筑/基础设施采购过程效果批发风险转移。

著录项

  • 来源
    《Building》 |2020年第7期|26-26|共1页
  • 作者

    Rudi Klein;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号