首页> 外文期刊>Building >Safety competence report findings 'problematic'
【24h】

Safety competence report findings 'problematic'

机译:安全能力报告结果“有问题”

获取原文
获取原文并翻译 | 示例
       

摘要

Experts have questioned how a new report aiming at tackling the competency issues in the industry would work in practice. The Competency Steering Group's interim report, Raising the Bar, published on Friday last week, made 67 recommendations looking to establish a new building safety competence committee and come up with competence frameworks to apply to all those working on high-risk residential buildings. But Steve Cooper, a director at fire engineering consultant Tenos and member of a competence steering group working group, said the aims of the report were "laudable" but its implementation will be problematic.
机译:专家们质疑旨在解决行业能力问题的新报告在实践中将如何运作。上周周五发布的能力指导小组的中期报告“提高标准”提出了67条建议,以建立一个新的建筑安全能力委员会,并提出能力框架,以适用于所有在高风险住宅建筑中工作的人员。但是消防工程顾问Tenos的主管,能力指导小组工作组的成员Steve Cooper表示,该报告的目标“值得称赞”,但其实施将有问题。

著录项

  • 来源
    《Building》 |2019年第33期|11-11|共1页
  • 作者

    Thomas Lane;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:29:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号