首页> 外文期刊>Building journal Hong Kong China >Shenzhen International Airport Terminal 3 Unconventional technical solutions
【24h】

Shenzhen International Airport Terminal 3 Unconventional technical solutions

机译:深圳国际机场三号航站楼非常规技术解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

The new Terminal 3 at Shenzhen International Airport was officially opened on November 28, after just five years of planning and construction. With an overall length of 1,500 m and a gross floor space of 500,000 sq m, it increases the capacity of the existing airport in future by up to 40 million passengers per year. The project is the result of an international competition held in 2008, from which the team of Italian architect Massimiliano Fuksas supported by German engineers Knippers Helbig emerged victorious. Based on a given building organization and floor plan structure, a freely shaped terminal design was developed allowing plenty of natural light through a large number of openings in the interior.
机译:经过短短五年的规划和建设,位于深圳国际机场的新3号航站楼于11月28日正式启用。它的总长度为1,500 m,总建筑面积为500,000平方米,未来将使现有机场的容量每年增加4000万乘客。该项目是2008年国际竞赛的结果,意大利建筑师Massimiliano Fuksas团队在德国工程师Knippers Helbig的支持下获得了胜利。根据给定的建筑组织和平面图结构,开发了自由造型的终端设计,可通过内部的大量开口获得充足的自然光。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号