【24h】

Long Ching Estate

机译:朗晴村

获取原文
获取原文并翻译 | 示例
           

摘要

Located at the north of Yuen Long Town Centre, the Public Rental Housing development at the reduced site for Ex-Yuen Long Estate shall provide 438 flats in early 2016. The small elongated site is about 0.43 hectare, bounded by heavily trafficked roads on three sides. Apart from the emission impact from the adjacent factory buildings, the site layout is subject to the notable nuisance due to the elevated MTR viaduct of Long Ping Station. Like many other residential developments in urban context of Hong Kong that have lots of environmental constraints, the site is lack of open space and subject to complex geotechnical constraints. It lies within both the Scheduled Area No. 2 (North West New Territories) and Scheduled Area No. 3 (Railway protection areas). Ground Investigation information reveals that the site is underlain by interbedded layers of hard and soft materials from approximately 20m-130m deep.
机译:位于元朗市中心北面的原元朗reduced减幅用地的公共租赁房屋开发项目将于2016年初提供438个单位。细长的小面积约0.43公顷,由三边人流密集的道路包围。除了邻近工厂厂房的排放影响外,由于朗屏站的地铁高架桥架空,场地的布置会受到明显的滋扰。与香港市区其他许多住宅开发项目一样,这些开发项目受到很多环境限制,该场地缺乏开放空间,并且受到复杂的岩土工程限制。它同时位于第二计划区(新界西北)和第三计划区(铁路保护区)内。地面调查信息显示,该场地位于大约20m至130m深的硬硬材料层间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号