首页> 外文期刊>Building and Environment >Evaluations of existing waste recycling methods: A Hong Kong study
【24h】

Evaluations of existing waste recycling methods: A Hong Kong study

机译:评估现有废物回收方法:香港的一项研究

获取原文
获取原文并翻译 | 示例
       

摘要

Environmental problems have been considered as a serious situation in Hong Kong construction. Waste management is pressing harder with the alarming signal warning the industry. Reuse, recycling and reducing the wastes are considered as the only methods to recover the wastes generated; however, the implementations still have much room for improvement. In order to ameliorate the existing situations, evaluations of the existing waste recycling methods are studied in this research. A telephone interviewing to the recyclers, site visits to the construction and demolition sites (including the Lower Ngau Tau Kok Estate Phase 1) and the centralized recycling plant in Tuen Mun Area 38 are under investigation. Difficulties encountered for various recycling parties are investigated. Rather than the poor quality found from the recyclable materials, they found the high investment cost, lengthy demolition period and limited space caused the major barriers for them. Therefore, some recommendations are suggested: (ⅰ) proposing a higher landfill charging scheme; (ⅱ) setting up a centralized centre for recycling the materials; (ⅲ) examining the Hong Kong government should be supported in the provision of land for recycling plants; (ⅳ) implementing innovative demolition methods; (ⅴ) allowing some locations in town for residents' easy access to drop-off recyclable materials; (ⅵ) allowing flexible demolition periods; (ⅶ) setting up recycling plant in town or in the form of mobile installations; (ⅷ) reusing the reusable components as donations to the charity organization; (ⅸ) providing higher flexibility in receiving concrete waste in Tuen Mun Area 38 recycling plant; and (ⅹ) balancing the supply and demand of recycled materials through legislations or incentive schemes.
机译:环境问题被认为是香港建设中的严重情况。废物管理正以警告信号警告业界。再利用,再循环和减少废物被认为是回收产生的废物的唯一方法;但是,这些实现仍有很大的改进空间。为了改善现状,本研究对现有废物回收方法进行了评估。正在电话采访回收者,对建筑和拆除场所(包括牛头角下村第一阶段)和屯门第38区的集中回收工厂进行实地考察。调查了各种回收方遇到的困难。他们发现,高昂的投资成本,漫长的拆除时间和有限的空间是造成可回收材料的主要障碍,而不是从可回收材料中获得的劣质产品。因此,提出了一些建议:(ⅰ)提出更高的填埋场收费方案; (ⅱ)设立一个中心,以回收物料; (ⅲ)审查香港政府应提供土地供循环再造厂之用; (ⅳ)实施创新的拆除方法; (ⅴ)允许城镇中的某些地方居民方便地取放下放的可回收材料; (ⅵ)允许灵活的拆除期限; (ⅶ)在城镇或以移动装置的形式建立回收工厂; (ⅷ)将可重复使用的组件作为对慈善组织的捐赠加以利用; (ⅸ)在屯门第38区循环再造厂接收混凝土废物时提供更大的灵活性; (ⅹ)通过立法或奖励计划平衡再生材料的供需。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号