首页> 外文期刊>Building design >Should the government speed up school rebuilding?
【24h】

Should the government speed up school rebuilding?

机译:政府是否应该加快学校重建速度?

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Yes it should, and there are two reasons why such a move would produce several benefits.rnFirst of all, it is perfectly clear to me (and to everyone else, no doubt) that the economy is slowing down and the number of opportunities coming to market in the commercial sectors is reducing rapidly.rnAnd second, while the Building Schools for the Future programme has been up and running for some time now, it has yet to deliver the transformation in educational outcomes that the programme was originally designed to facilitate.rnPut simply, this slow progress is due to the cumbersome nature of the procurement process, which means that relatively few schools have actually been completed. Added to that, the PFI mind-set that bedevilled some of the early schemes is only now working its way out of the system through the workings of the Cabe review process and other design-focused initiatives.
机译:是的,应该这样做,并且这样做有两个好处。这首先有两个原因,我首先很清楚(毫无疑问,我和其他所有人)经济正在放缓,机遇到来的机会越来越多。第二,虽然“面向未来的建设学校”计划已经启动并运行了一段时间,但它尚未实现该计划最初旨在促进的教育成果的转变。简而言之,这种缓慢的进展是由于采购过程繁琐的性质,这意味着相对较少的学校实际上已经完工。除此之外,困扰一些早期计划的PFI思维方式现在仅通过Cabe审查流程和其他以设计为重点的计划的工作而逐渐退出系统。

著录项

  • 来源
    《Building design》 |2008年第1841期|11|共1页
  • 作者

    Gavin Elliott;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号