首页> 外文期刊>Building design >U-turn on station designs
【24h】

U-turn on station designs

机译:掉头站设计

获取原文
获取原文并翻译 | 示例
           

摘要

Plans for every station on the £15 billion Crossrail project are set to be subject to independent design review, Crossrail bosses have announced. The U-turn, announced at a London Assembly transport committee meeting last week, follows Crossrail's decision in December not to use a dedicated design review panel set up by watchdog Cabe on the 27 outer London surface stations. It had previously used the expert advice on its 10 new-build underground stations in central London. But Crossrail chief executive Andrew Wolstenholme said there was "an opportunity" that the 27 redeveloped surface stations on the line will now be externally reviewed. He added that he cared "passionately" about the design quality of the project.
机译:Crossrail老板们宣布,这项耗资150亿英镑的Crossrail项目中每个车站的计划都将接受独立设计审查。上周在伦敦议会运输委员会会议上宣布的掉头,是在12月Crossrail决定不使用看门狗Cabe在伦敦27个外地面站建立的专门设计审查小组之后作出的。它以前在伦敦市中心的10个新建地铁站上使用了专家建议。但是,Crossrail首席执行官安德鲁·沃尔斯滕霍姆(Andrew Wolstenholme)表示,“有机会”对这条线上27个重新开发的地面站进行外部审查。他补充说,他“非常”关心项目的设计质量。

著录项

  • 来源
    《Building design》 |2014年第14期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号