...
首页> 外文期刊>Building design >Design teams could be on hook for retrospective leaseholder claims
【24h】

Design teams could be on hook for retrospective leaseholder claims

机译:设计团队可以追溯到回顾性租赁符号索赔

获取原文
获取原文并翻译 | 示例
           

摘要

One of the proposals in the Building Safety Bill is an amendment to the Defective Premises Act 1972 (DPA) which would extend the limitation period from six years post-completion of the building to 15 years. This change is likely to impact everyone in the industry who has been involved in residential development for the last 15 years – or who will be in the future. The proposal is for the changes to be implemented two months after the Royal Assent of the bill which is understood to be in May 2022. Therefore the DPA changes will likely occur in July 2022.
机译:建筑安全法案中的一项提案是1972年缺陷处所(DPA)的修正案,该法案将延长建筑物完成后六年的限制期限为15年。 这一变化可能会影响过去15年的住宅开发的行业中的每个人 - 或将来是谁。 该提案是为了改变账单的皇家同意才能在2022年5月待办事项。因此,DPA变更将在2022年7月发生。

著录项

  • 来源
    《Building design》 |2021年第12期|1-3|共3页
  • 作者

    Andrew Mellor;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号