At 840,000 sf, the Exempla St. Joseph Heritage Hospital in Denver is the nation's largest private hospital construction project. The $625 million, 348-patient room facility is due to be completed this September, nearly six months ahead of the initial construction schedule. Working under a modified integrated project delivery (IPD) contract, the project's Building Team— led by the joint design team of Davis Partnership, H+L Architecture, and ZGF, with Mortenson Construction as general contractor-is applying advanced, multi-trade prefabrication techniques to compress the schedule and achieve cost savings for the client.
机译:丹佛的Exempla圣约瑟夫传统医院占地840,000平方英尺,是美国最大的私人医院建设项目。这项耗资6.25亿美元,可容纳348人的病房设施将于今年9月完工,比最初的建设计划提前了近六个月。根据修改后的综合项目交付(IPD)合同,由戴维斯合伙公司,H + L建筑和ZGF的联合设计团队领导的项目建筑团队,由Mortenson Construction作为总承包商,正在应用先进的多行业预制件压缩时间表并为客户节省成本的技术。

著录项

  • 来源
    《Building design & construction》 |2014年第5期|36-36|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号