DUAL, OFTEN INCOMPATIBLE, MANAGEMENT SYSTEMS ADD WORK AND COST TO PROJECTS

机译:双重,经常不兼容的管理系统增加了项目的工作量和成本

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A new survey of building owners and contractors highlights the challenges of managing construction projects when software applications lack automated data exchange processes. The report, "Connecting Owners and Contractors: How Technology Drives Connected Construction," was released by e-Builder, a Trimble Company, and Dodge Data & Analytics. It is based on responses to online surveys last Spring from 112 contracting companies and 98 building owners.
机译:一项针对建筑物所有者和承包商的新调查突出显示了当软件应用程序缺乏自动数据交换流程时管理建筑项目的挑战。该报告“连接业主和承包商:技术如何推动互联建筑”由e-Builder,Trimble公司和道奇数据与分析公司发布。它基于去年春季对112家签约公司和98位业主的在线调查的答复。