CPB CONTRACTORS PTY LTD v CELSUS PTY LTD (NO 2)

机译:CPB Contractors Pty Ltd V Celsus Pty Ltd(第2号)

获取原文
获取原文并翻译 | 示例
           

摘要

I have considerable sympathy for the attempt made by the Builders to attempt to fashion a pragmatic way in which all issues can be resolved efficiently. The fact is, however, that as the State submits, almost all of the factual controversy between the State and the Builders will already be the subject of findings by the current determination of the arbitral proceedings before Dr Lindgren. The perceived problem caused by the failure to be able to have the IC participate, so that the resolution of all issues is achieved in a way which will be binding on all parties, is one which is a function of the particular contractual regime which was agreed between the parties.
机译:我对建筑商的尝试具有相当大的同情,以尝试更加务实的方式,其中可以有效地解决所有问题。然而,事实上,作为国家提交的,州和建筑物之间的几乎所有事实争议都将成为目前在LINDGREN博士之前确定仲裁诉讼的结果。未能能够拥有IC参与的感知问题,以便在所有缔约方都有约束的方式实现所有问题的解决,这是一个达成的特定合同制度的职能双方之间。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号