首页> 外文期刊>Bridge design & engineering >Catch-up maintenance on forgotten Dominican bridge
【24h】

Catch-up maintenance on forgotten Dominican bridge

机译:乘坐忘记多米尼加桥上的追赶维修

获取原文
获取原文并翻译 | 示例
       

摘要

A landmark crossing carrying 183,000 vehicles per day in the heart of the Dominican Republic's capital has been rehabilitated after not receiving any maintenance since its opening nearly 20 years ago. The cable-stayed Juan Bosch Bridge designed by Carlos Fernandez Casado was closed to traffic in May, after the Ministry of Public Works admitted that the bridge had become a safety risk for users and that damage was being caused to vehicles. The 627m-long, 33.5m-wide bridge crosses the Ozama River in Santo Domingo and has a main span of 180m supported by 63m-high pylons with 48 double cable stays at 10m spacing.
机译:在多米尼加共和国资本的核心中,在多米尼加共和国资本的核心中携带183,000辆车的地标过度,自近乎20年前的开场以来,在没有收到任何维护后得到了康复。 在公共工程部承认这座桥已成为用户的安全风险之后,由Carlos Fernandez Casado设计的缆绳博世博士桥在5月份关闭到交通。 627米长的33.5米宽的桥梁穿过Santo Domingo的欧扎山河,主跨度为180米,由63米高的塔架支撑,带48个双电缆停留在10米间距。

著录项

  • 来源
    《Bridge design & engineering》 |2021年第104期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 02:55:59

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号