首页> 外文期刊>Automotive engineer >Magna takes over Porsche assembly
【24h】

Magna takes over Porsche assembly

机译:麦格纳接管保时捷总装

获取原文
获取原文并翻译 | 示例
           

摘要

Magna Steyr will build the next Porsche Boxster and Cayman in Austria when Finnish manufacturer Valmet's contract for the current models expires in 2012. Cost and the fact that Magna is developing some of the bodywork for the Porsches influenced the decision. Demand exceedsrnPorsche's Zuffenhausen plant's capacity and it can't make everything in-house. The firm is also widening its range. A partner able to handle development will help share the work better. Magna andrnValmet agree that these are tough times for contract assembly firms.
机译:当芬兰制造商维美德与现有车型的合同于2012年到期时,麦格纳斯太尔将在奥地利制造下一辆保时捷Boxster和Cayman。成本和麦格纳为保时捷开发一些车身的事实影响了这一决定。需求超出了保时捷祖文豪森工厂的产能,它无法将所有东西都放在内部。该公司还在扩大范围。有能力进行开发的合作伙伴将有助于更好地共享工作。麦格纳(Magna)和恩·瓦尔梅特(rnValmet)同意,这对于合同组装公司来说是艰难的时期。

著录项

  • 来源
    《Automotive engineer》 |2008年第7期|8|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号