首页> 外文期刊>Automation in construction >Application of 4D for dynamic site layout and management of construction projects
【24h】

Application of 4D for dynamic site layout and management of construction projects

机译:4D在建筑项目动态场地布局和管理中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Construction schedules and site space arrangement are essential to project management, as they directly influence security, machine running, material deployment, power distribution as well as construction progress and cost. There has been a strong need for more effective planning and management of site space and facilities. This paper introduces a 4D Integrated Site Planning System (4D-ISPS) which integrates schedules, 3D models, resources and site spaces together with 4D CAD technology to provide 4D graphical visualization capability for construction site planning. The features of 4D-ISPS are described in detail. The implementation techniques of this system are also discussed and a real life case is presented.
机译:施工时间表和场地空间布置对于项目管理至关重要,因为它们会直接影响安全性,机器运行,材料部署,配电以及施工进度和成本。强烈需要对场地空间和设施进行更有效的规划和管理。本文介绍了一种4D集成场地规划系统(4D-ISPS),该系统将进度表,3D模型,资源和场地空间与4D CAD技术集成在一起,为建筑场地规划提供4D图形可视化功能。详细介绍了4D-ISPS的功能。还讨论了该系统的实现技术,并给出了实际案例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号